Download PDF is not available here: the PDF library could not be loaded, often because the network blocks it. Print can save the plan as a PDF instead; reload the page to try the library again.
What the plan noticed about your answers and today’s staffing.
Levels read associate / professional / senior / principal, in that order, split by the family’s level mix: 2/6/5/1 is 2 associate, 6 professional, 5 senior and 1 principal. Each job description below gives the same count per level.
| Role | Levels | Current | Required | Gap |
|---|
The range of the total to expect from the spread the research found for every ratio, and which single ratios move it most.
Where today’s organization already shows a ratio, you can adopt it. Adopting sets each ratio to the figure at which the plan needs no more people than today’s ratio gives, as close to today’s staffing as rounding in each group allows (the note under each ratio shows the arithmetic). This is only right where today is healthy: an audit finding or a poor delivery metric means the model value is the better guide.
| Ratio | Model value | Observed today | Adopt |
|---|
One per role in this plan: mission, responsibilities, must-haves and nice-to-haves, measures of success and what changes from associate to principal, with the level of responsibility each sits at in the Skills Framework for the Information Age. Reporting lines follow the line-management structure above.
Save the plan as it stands, change answers, and compare. Loading a scenario replaces every answer with the saved ones.
| Scenario | People required | Annual cost | Hires | Months to productive | Groups | Teams | Profile | Topology |
|---|
| Question | Answer |
|---|
Three default columns, one per level of assurance; the profile may override single values. standard comes from a published framework, regulatory is a staffing consequence of a compliance obligation, benchmark is a practitioner ratio. Research low to high is the spread the research found at this plan’s level of assurance. For a ratio, the optimistic and the conservative end multiply the value the plan uses by that spread as a share of the typical value; the confidence band moves each ratio alone to its two ends and treats the ratios as independent. Minimums, thresholds and limits do not move. A value marked as a profile value is set by the industry profile, which gives its reason; a value marked as your value is one you changed, and Reset to defaults puts every one back. Edits are kept in this browser.
| Parameter | Tag and evidence | Commercial | Regulated | High assurance | This profile | Research low to high | Optimistic end | Conservative end |
|---|
Each role’s required number is split over the four levels by the shares of its job family, or by those of its own role where the table gives the role a row of its own, and rounded by largest remainder, so the levels add up to the role’s number: these are the figures in the levels column of Required versus current, and the cost of every role follows them. A family or role marked as yours uses the level mix in your answers; the others use the planner’s defaults.
| Job family or role | Associate | Professional | Senior | Principal |
|---|
| Figure | Value | Where it comes from |
|---|
Method: teams and developers per team are the inputs. Developers per group follow. Each role is a ratio of a driver (teams, developers, engineers or headcount) with a per-profile minimum, rounded up because people are hired whole; where small needs are shared, a need is rounded to the nearest person, and a need below half a person is carried by someone already there. Context answers switch roles on; the topology sets the vocabulary and the line-management rule. Metrics outside their thresholds tighten the ratios they implicate, and every adjustment is shown. Community time is reported as full-time equivalents and never added to headcount. The band moves each ratio alone to the low and the high of its range and combines the swings of every ratio that moves the total as independent, so it is the spread to expect rather than every worst case at once; the sensitivity chart names the ratios that move it most, ten at most, and the line under it says how many ratios the band combines.